Model Sugar-Energy Plant
Sugar, Ethanol & Bioenergy · 8 phases · 25 areas · from scale to MWh
The LakeX digital twin syncs in real time with IoT, PLCs and SCADA to simulate operational scenarios, predict behaviors and reconstruct any past moment — without touching the real world.

Mirrors and acts on IoT, PLCs and SCADA in real time — the twin follows the asset every instant.
Test changes, scenarios and stops on the twin before touching the real world.
Reconstruct the exact plant state at any past instant to investigate events.
Machine Learning (ML) algorithms estimate each asset's Remaining Useful Life (RUL) and detect anomalies — including by vibration analysis (FFT — Fast Fourier Transform) — so failure becomes a signal before it becomes a shutdown.
Each model already ships the plant's sensor map and equipment tree — from the sugar-energy plant to GMP pharma. Activate it, connect LakeXAgent and start operating.
Sugar, Ethanol & Bioenergy · 8 phases · 25 areas · from scale to MWh
Digester, recovery boiler and paper machine
Distillation towers, tanks, flare and compression
Offshore platform with derrick, top drive and BOP
Container ships with monitored engine room
Brewing, fermentation and filling line
Continuous ovens, cold rooms and packaging
138/13.8 kV · transformers, breakers and busbars
Feeders, reclosers and capacitor banks
Clarifiers, aeration, filters and pumping stations
Craft beer · 6 levels · 18 areas · controlled fermentation
Fuel ethanol · 7 levels · 22 areas · biomass processing
Steel production · 7 levels · 28 areas · blast furnace + steelmaking + rolling
Refining & Petrochemical · 7 levels · 26 areas · cracking + polymerization
Medicines · 6 levels · 16 areas · synthesis + formulation + filling
Pulp + Paper · 7 levels · 24 areas · pulping + bleaching + paper machine
Mining + Concentration · 7 levels · 20 areas · extraction + processing

Start from a ready model, connect LakeXAgent to your equipment and tune the ISA-95 tree to your plant. Observability and AI agents run on top of the same twin.
We pick the model closest to your plant and put the first digital twin into production in weeks.